PRELIMINARY BASIC ENGINEERING SPECIFICATION

1 Plant description

Detailed description of the plant operations

2 P&I Diagram

This diagram shows all the equipment and instruments with relevant connections, valves, sampling points and utility connections within the battery limits of the plant. Schedule and diameter of all pipes and relevant individuation numbers are indicated together with the thermal insulation requirements.

3 Equipment List

All equipment included in the battery limits are listed with the following information:
  • item number
  • denomination
  • main dimensions
  • construction material
  • installed power (if any)

4 Equipment Specifications

Specifications of main equipment. The content of the documents is suitable to obtain binding offers from qualified suppliers.

5 Instrument List

All instruments included in the battery limits (measuring elements, indicators, transmitters, controllers, recorders etc.) are listed with the following information:
  • item number
  • denomination
  • rating of involved parameters

6 Piping schedules

Requirements relevant to the piping:
  • construction materials
  • description of special valve requirements

7 Electrical User List

All users of electric power are listed with the following information:
  • user item
  • user denomination
  • installed power (preliminary estimate)

8 Hypothesis of Plant Layout

This layout, including plans and sections, based on dimensions of standard equipment available in Europe, is suitable to define:
  • space requirements
  • hypothesis of supporting and service steel structures